QA/QC NDT Inspection Engineer
NDT.org Member Since: 2021
Added: 1/30/2021
Last Updated: 1/30/2021
Country:
Pakistan
Status:
I am willing to Travel.
I need a job as soon as possible.
I am willing to work overseas.
I prefer temp jobs.
I prefer permanent jobs.
Certifications
● ASNT NDT Level II Ultrasonic Testing
● ASNT NDT Level II Phased Array Ultrasonic Testing
● ASNT NDT Level II Dye Penetrant Testing
● ASNT NDT Level II Magnetic Particle Testing
● ASNT NDT Level II Radio Graphic Testing
● ASNT NDT Level II Magnetic Flux Leakage
● CWB Basic Inspection Method
● CWB Welding Health and Safety
Education
2012 to 2016 | B.Sc. Metallurgy and Materials Engineering
68.69% Bahauddin Zakariya University Multan
2009 to 2012 | D.A.E Metallurgy and Welding
73.20% Government Swedish Pakistani College of Technology Gujrat
2007 to 2009 | Matriculation
82.61% Government Higher Secondary School Qadir Abad
Experience
● Organization: Applus Velosi (Pvt) Ltd. Lahore, Pakistan
Duration: May 2019 –To Present
Position: QA/QC Inspection Engineer
Project:
1263 MW Punjab Thermal Combined Cycle Power Plant Haveli Bahadur Shah Jhang.
Client:
China Machinery Engineering Corporation (CMEC)
Responsibilities:
Conducting different Non-Destructive Testing on client requirements.
After inspection interpret results according to code and standards and make the inspection report
Making Request for Inspection (RFI) for a consultant
Positive Materials Identification of Welding Consumable
Manage the project QA/QC team including, QC inspectors and other quality control staff and
document control staff assuring flawless execution of all quality control activities.
Ensure safety goals are achieved on the project and oversee implementation of safety
procedures on the project
Manage Daily Quality Toolbox Talk & Weekly site Quality Walkthrough along with construction
staff
Prepare and submit a weekly quality report to client and Company managements
Project Highlights:
HRSG Boilers
Gas and Steam Turbines.
Fuel oil and Fuel Gas Pipeline.
Firefighting Pipe Line.
Oil and Water Storage Tank.
Circulating Cooling Water Pipe Line.
Project:
Lucky Electric Power Company Limited 660 MW Coal Fire Power Plant Port Bin Qasim Karachi
Client:
Shandong Electric Power Construction Corporation (SEPCO3)
Responsibilities:
Conducting different Non-Destructive Testing on client requirements.
After inspection interpret results according to code and standards and make the inspection report
Making Request for Inspection (RFI) for a consultant
Positive Materials Identification of Welding Consumable
Manage the project QA/QC team including, QC inspectors and other quality control staff and
document control staff assuring flawless execution of all quality control activities.
Ensure safety goals are achieved on the project and oversee implementation of safety
procedures on the project.
Manage Daily Quality Toolbox Talk & Weekly site Quality Walkthrough along with construction
staff
Prepare and submit a weekly quality report to client and Company managements
Project Highlights:
Steam Turbine.
Coal Fire Boiler
Oil and Water Storage Tank
Fire Fighting Pipe Line
Project:
Power Cement Noria Abad Sindh
Client:
Tianjin Electric Power Construction (Pvt) Ltd
Responsibilities:
Perform Different NDT Inspection on the following objects.
UFD of Steel Stack, Diesel Storage Tank, Retainer Block etc.
DPT of Spool, Diesel Storage Tank, Bag Filter, Casing and Hooper etc.
MPI of Casing and Hooper etc.
Project:
Pakistan State Oil Kamari Terminal C & A, Karachi
Client:
Joint Engineering Services (Pvt) Ltd.
Responsibilities:
UTG of tank shell by UT Crawler
VBT & MFL of tank bottom
Drawing of the shell, bottom and roof
Client:
Pak-Arab Refinery Company Limited (PARCO)
Responsibilities:
Ultra-Sonic Thickness Gauging
MFL Magnetic Flux Leakage of Oil Storage Tank
Dye Penetrate Testing
Magnetic particle Testing
Firefighting Pipe Line.
Oil and Water Storage Tank.
Circulating Cooling Water Pipe Line.
Project:
Lucky Electric Power Company Limited 660 MW Coal Fire Power Plant Port Bin Qasim Karachi
Client:
Shandong Electric Power Construction Corporation (SEPCO3)
Responsibilities:
Conducting different Non-Destructive Testing on client requirements.
After inspection interpret results according to code and standards and make the inspection report
Making Request for Inspection (RFI) for a consultant
Positive Materials Identification of Welding Consumable
Manage the project QA/QC team including, QC inspectors and other quality control staff and
document control staff assuring flawless execution of all quality control activities.
Ensure safety goals are achieved on the project and oversee implementation of safety
procedures on the project.
Manage Daily Quality Toolbox Talk & Weekly site Quality Walkthrough along with construction
staff
Prepare and submit a weekly quality report to client and Company managements
Project Highlights:
Steam Turbine.
Coal Fire Boiler
Oil and Water Storage Tank
Fire Fighting Pipe Line
Project:
Power Cement Noria Abad Sindh
Client:
Tianjin Electric Power Construction (Pvt) Ltd
Responsibilities:
Perform Different NDT Inspection on the following objects.
UFD of Steel Stack, Diesel Storage Tank, Retainer Block etc.
DPT of Spool, Diesel Storage Tank, Bag Filter, Casing and Hooper etc.
MPI of Casing and Hooper etc.
Project:
Pakistan State Oil Kamari Terminal C & A, Karachi
Client:
Joint Engineering Services (Pvt) Ltd.
Responsibilities:
UTG of tank shell by UT Crawler
VBT & MFL of tank bottom
Drawing of the shell, bottom and roof
Client:
Pak-Arab Refinery Company Limited (PARCO)
Responsibilities:
Ultra-Sonic Thickness Gauging
MFL Magnetic Flux Leakage of Oil Storage Tank
Dye Penetrate Testing
Magnetic particle Testing
Corrosion Mapping of Sulfuric Acid Tanks
DPT of Spools and Shafts
Ultra-sonic Thickness Gauging of HSD Fuel Tank
Client:
Askari Cement Limited Wah Rawalpindi
Responsibilities:
UTG of Killen
UFD of Killen tyre
Client:
Cherat Cement Company Limited Nowhere (KPK)
Responsibilities:
UTG of Killen
UFD of Killen tyre
DPT of Killen tyre
● Organization: Ravi Green Engineering Pvt. Ltd Lahore
Duration: July 2016– Mar2017
Position: Trainee Engineer
Responsibilities
Manage all inspections and tests including supervision of site testing laboratory, coordination
with independent testing laboratory/3rd party inspectors, documenting and submitting test
results and following up for review and approval of the client.
Inspecting Incoming Material Quality
Verifying MTC (Mill Test Certificates) of Incoming Material
Fit-Up Inspection
Visually Root Weld Inspection & Final Weld Inspection.
Interpret Radio Graphic Films
UFD, MPI and DPT
Make arrangements for inspecting Hydro Tests of Bowsers & Pressure Vessels
● Turnarounds and Shut Downs
Pak Arab Fertilizer Multan
Fatima Fert Limited Sheikhupura
Liberty Power Tech Faisal Abad
Pioneer Cement Khushab
ICI Polyester Sheikhupura
National Refinery Limited Karachi
ENAR Petroleum Refining Facility Karachi