Evident Ultrasonic Inspection Equipment
API 510/653 Qualified Inspector with IRATA

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Malaysia
Status:
I am willing to Travel.
I am willing to work overseas.
Certifications
API 653 Certified Tank Inspector (27791)
API 510 Certified Pressure Vessel Inspector(29620)
CSWIP 3.1 General Welding Inspector(8786)
ICORR Level 1 Painting Inspector (C0961)
PCN UT Level 2 Category 3.1v, 3.2, 3.8 & 3.9
MLVK Level II in Eddy Current Testing(085260)
ASNT Level II in Ultrasonic Testing
ASNT Level II in Magnetic Particle Testing(MPT)
ASNT Level II in Dye Penetrant Testing(DPT)
IRATA Rope Access Level 1
Education
Diploma in Technology
Electrical Equipment and Installation,
Malaysia France Institute
Experience
September 2009
Seconded to MMC Engineering Sdn Bhd as authorised tank
inspector during Tank Farm A verification of rectification
work at Petronas Dagangan Berhad at Bulk Port,Pasir Gudang.
To performed external inspection,rectification and repair
work method and execution activities acording to
construction reference code.

July 2009
Seconded to SEM Inspection Sdn Bhd as static equipment
inspector during Malaysia LNG DOSH Shutdown Module 1. To
performed external & internal inspection,recommendaton and
repair work method and execution activities.

June 2009
Seconded to NDE Consultancy Sdn Bhd as tank inspector
during Ammonia Tank inspection after repair work. To
performed external inspection,rectification and repair work
method and execution activities.

June 2009
Seconded to MMC Engineering Sdn Bhd as tank inspector
during tank re-inspection at Petronas Dagangan Berhad at
Bulk Port,Pasir Gudang. To performed external
inspection,rectification and repair work method and
execution activities.

June 2009
Seconded to Optimal Chemical Sdn Bhd as piping inspector
during 24” Medium steam line slip from pipe rack. To
performed external inspection,rectification and repair work
method and execution activities.

April 2009
Seconded to Optimal Chemical Sdn Bhd as Authorised tank
inspector during tank farm inspection campaign. To performed
external inspection and Phonon Diagnosis tools activities.

December 2008
Seconded to FPSO Ventures as a Inspection Engineer to
performed base line inspection on top side equipment and
piping at Bunga Kertas Field.

November 2008
Seconded to M3NERGY as a API510 to carry-out visual and CSAN
of 3nos of Sea Chest vessel at PERINTIS-FPSO equipment
integrity assessments on static equipment.

August 2008
Seconded to PETROFAC Malaysia as a API510/RBI Inspector to
carry-out base line of 32nos un-fired pressure vessel at
Cendor MOPU(Mobile Operation Production Unit) Producer
equipment integrity assessments on static equipment.

Feb 2007 to June 2008
Seconded to Esso Malaysia Berhad as a lead QA/QC department
and API 653 Certified Inspector to carried-out inspection,
establish standard procedure; Method of Statement (MOS) and
Inspection Test Plan (ITP) for Tank 2 Major Maintenance and
Repair include Tank Jacking activity.

Seconded to Warga Hikmat Kejuruteraan as a QA/QC Engineer
during Tank 2 Major Maintenance and Jacking at Esso Port
Dicson.Assist a WHK to establish MOS(Method of Statement),
monitoring QA/QC activity,prepare the repair procedure and
welding procedure to replace a bottom plate,annular
plate,pontoon support leg,cut and re-install door
sheet,replacement of marine suction flange,jacking and
review all document according to API653 specification
required.

Seconded to Warga Hikmat Kejuruteraan as a QA/QC Engineer
during Tank 14 Repair and Conversion of product at Esso
Port Dicson.Assist a WHK to establish MOS(Method of
Statement), monitoring QA/QC activity,prepare the repair
procedure and welding procedure to patch a bottom plate and
rectify a slanted support column and install a steam
coil.Review all related document according to API653
specification required.


Jan 2007
Seconded to Petronas Penapisan Melaka Sdn Bhd as Static
Equipment Inspector during PSR-1 Turnaround 2007.Responsible
to carried-out inspection and monitoring repair on 6nos of
plat forming reactor/CCR.

Jan 2007
Seconded to EPEMSB, as Plant and Piping Inspector for
Corrosion under Insulation assessments. Prepare data and
selection of NDT activities for Ethylene and Polyethylene
plant. Identify and locate CUI location as per API 570
Process Piping. Interpret, reviewed and justify Computerize
Radiography film and analyze data for RBI baseline purposed.

November 2006 to Dec 2007
Seconded to Ethylene Polyethylene Malaysia Sdn Bhd (EPMSB)
as Plant and Piping Inspector for certificate of fitness
(CF) extension.To perform and prepare final report and
compilation of all ndt report before submission to DOSH.

Seconded to EPEMSB as Static Equipment Inspector during
Boiler B shutdown. To performed internal and external
inspection activities and prepare inspection documentation
for DOSH inspection. To ensure that all the welding and
associated actions are carried out in accordance with
procedure or work being carried out for repair work.

August 2006 to October 2006
Seconded to Karachaganak Plant Operating, Kazakhstan as
Plant and Piping Inspector for KPC,Unit 1,Unit 2 and Unit 3
Shutdown.To perform inspection and advise to local inspector
during prepare final report and compiling of all ndt
report.

October 2005 tol August 2006
Seconded to EPEMSB, as Plant and Piping Inspector for
Corrosion Under Insulation assessment. Prepare data and
selection of NDT activities for Ethylene and Polyethylene
plant. Interpret, reviewed and justify Computerize
Radiography film and analyze data.

Seconded to EPEMSB as Static Equipment Inspector during
Furnace F-105 Shutdown and monitoring internal insulation
replacement work. To performed internal and external
inspection activities and prepare inspection documentation
for DOSH inspection.

Seconded to EPEMSB, as Welding/QC Inspector for Fuel Gas
Piping Modification for furnace F-102.

August 2005
Seconded to Central Sugar Refinery –CSR Shah Alam as a
third party inspector to verified of 50meter Stainless Steel
Chimney accordence to client reference code. Review
inspection documents,conduct external and internal
inspection and planned for remedial works and
recommendations for future monitoring.To propose
repairs/procedures for repairs of Chimney.Review NDT reports
and comment on action to be taken.

Seconded to Malaysia LNG Sdn Bhd, Bintulu as Videoscope
Inspector during Boiler 1F-1520 August 2005. To performed
internal visual inspection and editing image through CCTV
and prepare preliminary and final report to client to
reviewed.

Seconded to Raytech-Baxy, Sungai Petani as Boroscope
Inspector during factory process piping installation. To
performed internal visual inspection of small bore stainless
steel pipe and editing image through CCTV and prepare
preliminary and final report to client to reviewed.


July to August 2005
Seconded to Petronas Fertilizer Kedah Sdn Bhd as Static
Equiment Inspector during PFKSB Turnaround 2005. To
performed internal and external inspection activities on
static equipment and others related equipment.

June to July 2005
Seconded to Optimal Chemical Sdn Bhd as Static Equipment
Inspector during Furnace Emergency Shutdown. To performed
internal and external inspection activities.

May 2005
Seconded to Petronas Fertilizer Kedah, as Static Equipment
Inspector during External Inspection at PFKSB. To performed
external inspection activities.

April – May 2005
Seconded to Petronas Penapisan Terengganu Sdn Bhd as Static
Equiment Inspector during PPTSB Turnaround 2005. To
performed internal and external inspection activities on
static equipment and others related equipment.

October 2004 – April 2005
Seconded to Petronas Fertilizer Kedah, as QC/Plant and
Piping Inspector during PFK plant extention Feed Gas CO2
Removal Unit project. To performed inspection activities and
to monitor welding and installation activities on static
equipment and pipings.Prepere final documention and punch
list.Involved in plant pre-commisionig and commisioning.

September – October 2004
Seconded to Malaysia LNG Sdn Bhd, Bintulu as Static
Equipment Inspector during Module 6 DOSH Shutdown 2004. To
performed inspection activities and to monitor welding
activities on static equipment and other related associate
pipings.

May – June 2004
Seconded to Petronas Gas Berhad as Third Party Inspector
performed inspection activities onto DOSH registered
equipment during Boiler Shutdown May 2004 at CUF Gebeng,
Kuantan.

Seconded to CUF, Gebeng as Static Equipment Inspector during
boiler tubes repair.

April 2004
Seconded to Petronas Penapisan Melaka Sdn Bhd as Static
Equipment Inspector during PSR-2 Phase 3 Turnaround 2004.

January 2004
Seconded to Petronas Fertilizer Kedah as Hardness Test &
Holiday Test Technician during PFK Shutdown Jan 2004.

Seconded to Petronas Fertilizer Kedah as Videoscope
Inspector during Sg. Line Rectification Work. To perfomed
internal visual inspection and editing image through CCTV
and prepare preliminary and final report to client to
reviewed.

August 2003
Seconded to Malaysia LNG Sdn Bhd, Bintulu as Static
Equipment Inspector during MLNG Module 5 Shutdown August
2003. To performed inspection activities on static equipment
and other related equipment.

July to Aug 2003
Seconded to Petronas Penapisan Melaka Sdn Bhd (PPMSB) as UT
Inspector during PSR-2 2003 Phase 2B Turnaround. To
performed Ultrasonic Thickness Measurement activities at
PSR-2 Area 2A.

July 2003
Seconded to Esso Malaysia Bhd as Vacuum Box Test Inspector
during Tank 24 project. To witness Vacuum Box Test
activities at Esso Malaysia Bhd, Port Dickson.

Seconded to Optimal Chemical Sdn Bhd as Videoscope Inspector
during C-6811, C-6404B Equipment Shutdown. Carried out
internal visua; inspection and editing image through CCTV
and prepare preliminary and final report to client to
reviwed.

Seconded to CUF, Kerteh as Videoscope Inspector during ASU
I, Cogen B Turnaround 2003. To perfomed internal visual
inspection and editing image through CCTV and prepare
preliminary and final report to client to reviewed.

April to May 2003
Seconded to Malaysia Liqufied Natural Gas Sdn Bhd, Bintulu
as Static Equipment Inspector during MLNG Module 1 DOSH
Shutdown April 2003. To performed inspection activities on
Static Equipment and other related equipment.

April 2003
Seconded to Chemitreat (M) Sdn Bhd as Holiday Test Inspector
during EPCC of Waste Water Stripping Unit & Guard Pond
project. To witness Holiday Test activities on piping at
Petronas Fertilizer Kedah (PFK).

Jan - February 2003
Seconded to Petronas Ammonia as Third Party Inspector
performed Eddy Current testing activities onto DOSH
registered equipment during PASB Shutdown February 2003 at
Kerteh Terengganu.

Seconded to Optimal Chemical as Plant Inspector performed
Inspection activities during Olefins Turnaround Jan/Feb 2003
onto static equipments. To performed field Inspection,
Photography report and preparation of final documentation
prior submission to client Inspection Engineer.


October 2002
Seconded to Petronas Gas Berhad as Third Party Inspector
performed Holiday testing activities onto DOSH registered
equipment during UPV Shutdown October 2002 at CUF Gebeng,
Kuantan.

September 2002
Seconded to Petronas Gas Berhad as Videoscope Inspector
performed Videoscopic Inspection activities onto HRSG'C' F2-
211C01 economizer tubes during Boiler Shutdown September
2002 at CUF Gebeng, Kuantan.
Seconded to Petronas Gas Berhad as Third Party Inspector
performed Holiday testing activities onto DOSH registered
equipment during UPV Shutdown September 2002 at CUF Gebeng,
Kuantan.

Seconded to Petronas Gas Berhad as Third Party Inspector
performed Holiday testing activities onto DOSH registered
equipment during UPV Shutdown September 2002 at Centralized
Utility Facility Kerteh, Terengganu.

Seconded to Proton Casting Plant as a MPI Inspector to
performing inspection onto engine and cassis component Sept
2002.

June – August 2002
Seconded to Petronas Penapisan Terengganu Sdn Bhd / KR-2 as
UTTM Inspector during performed thickness measurement
activities onto static equipment for periodically corrosion
monitoring and RBI data analysis.

Seconded to Petronas Gas Berhad as Plant Inspector performed
Inspection activities during GPP4 Turnaround June/ July 2002
onto static equipments, structures and pipings at GPP
Complex A, Kerteh, Terengganu. To performed field
Inspection, Photography report and preparation of final
documentation prior submission to client Inspection
Engineer.

Seconded to Shell Refinery Company, Port Dickson as a NDT
Technician during LRCC Turnaround 2002 to performed Dye
Penetrant Testing perform on Pressure Vessel, Orifice
Chamber and Reactor.

April 2001 – June 2002
As Ultrasonic Inspector seconded to Petronas Fertilizer
Kedah during PFK Turnaround 2002. Inspected all selected
joints of equipment welding integrity. To record nay
abnormalities and flaw detected during testing or any singed
of corrosion severity and liaise with PFK Inspection
Coordinator on action required of the equipment in line with
D.O.S.H requirements. Compiled the formal report in orderly
manner and make a proposal for repair activities.

Seconded to Petronas Gas Berhad as Static Equipment
Inspector performing Inspection activities during GPP-1 &
KCS-B May/June 2002 Turnaround at Kerteh, Terengganu.

Seconded to Petronas Gas Berhad – CUF as Videoscope
Inspector performed Videoscopic Inspection activities onto
HRSG'A' F2-211A01 economizer tubes during Boiler Shutdown
Feb 2002 at CUF Gebeng, Kuantan.

Seconded to Petronas Gas Berhad –CUF as Videoscope Inspector
performed Videoscopic Inspection activities onto HRSG'C' F1-
211C01 and HRSG'D' F1-211D01 boiler tubes during Boiler
Shutdown Feb 2002 at CUF Kerteh, Terengganu .

Seconded to Petronas Gas Berhad as Assistant Plant Inspector
performed general plant corrosion survey activities onto
static equipments, structures and pipings at GPP Complex B,
Santong, Terengganu. To assist Senior Plant Inspector on
field Inspection, Photography report and preparation of
final documentation prior submission to client Inspection
Engineer.

Seconded to PPTSB/KR-2 as an UTTM Inspector during
performed thickness measurement activities onto static
equipment for periodically corrosion monitoring and RBI data
analysis.

Seconded to Petronas Gas Berhad Complex A as Data Logger for
thickness measurement updating data entries during 2001
schedule static Equipment UTTM monitoring activities.

Seconded to Petronas Gas Berhad as Plant Inspector performed
Inspection activities during GPP- 2 Shutdown Oct 2001 onto
static equipments, structures and piping’s at GPP Complex A,
Kerteh, Terengganu. To performed field Inspection,
Photography report and preparation of final documentation
prior submission to client Inspection Engineer.

Seconded to Petronas Penapisan Terengganu Sdn Bhd as UTTM
Inspector during performed thickness measurement activities
onto Boiler Shutdown.

Seconded to Petronas Ammonia Sdn Bhd as Assistant NDT
Inspector during obtained NDT Inspection activities onto
static equipment Warranty Shutdown.

Seconded to MTBE/POLYPROPLYENE as Assistant Welding
Inspector obtained Videoscopic Inspection activities onto
AFC, Exchangers, Boiler during MTBE/PP(M) S/B 2001 Shutdown.

Seconded to Petronas Penapisan Melaka as Assistant NDT
Technician for CHEVRON/CORNOCO Baseline corrosion monitoring
onto selected critical pipelines program.

Seconded to Esso (M) Sdn Bhd Port Dickson as Assistant NDT
Technician/Inspector.

Seconded to Sun Boiler (M) Sdn Bhd Shah Alam as Assistant
NDT Technician/ Inspector during presure vessel fabrication
works.

Seconded to Petronas Penapisan Terengganu Sdn.Bhd. as
Assistant NDT Technician / Inspector during KR-2 Warranty
Shutdown and maintenance schedule inspection.
Comments
SUMMARY OF EXPERIENCE_____________________________________
Over nine (9) years of extensive experience in the oil and
gas industries in the field of Supervision, Quality
Assurance, Quality Control, Inspection of Materials, Welding
inspection and painting inspection of On-Stream and Off-
Stream Inspection in the oil and gas related industries i.e.
shop/yard fabrication, plant maintenance, on-shore plant
installation, pipe laying and maintenance work complying to
the safety standards, clients specification requirement and
relevant code and practice

STRENGTH__________________________________________________
Ability to work independent, self motivated, able to work
under pressure and minimum supervision and willing to travel
and undergo training for career development.
Pleasant personality and ready to learn new things for
company and self improvement.
Mistras Group