Mistras Group
API 510/653 with IRATA

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Malaysia
Status:
I am willing to Travel.
I am willing to work overseas.
Certifications
API 510 Certified Tank Inspector
API 653 Certified Tank Inspector
Welding Inspector (CSWIP 3.1)
Painting Inspector ICORR Level 1 (C0961)
MLVK Level II in Eddy Current Testing.
ASNT Level II in Ultrasonic Testing (UT), Magnetic Particle Testing(MPT) and Dye Penetrant Testing(DPT)
Education
Diploma in Electrical Equipment and
Installation Technology, MFI
Experience
December 2008
Seconded to FPSO Ventures as a Inspection Engineer to performed base line inspection on top side equipment and piping at Bunga Kertas Field.

November 2008
Seconded to M3NERGY as a API510 to carry-out visual and CSAN of 3nos of Sea Chest vessel at PERINTIS-FPSO equipment integrity assessments on static equipment.

August 2008
Seconded to PETROFAC Malaysia as a API510/RBI Inspector to carry-out base line of 32nos un-fired pressure vessel at Cendor MOPU(Mobile Operation Production Unit) Producer equipment integrity assessments on static equipment.

Feb 2007 to June 2008

Seconded to Esso Malaysia Berhad as a lead QA/QC department and API 653 Certified Inspector to carried-out inspection, establish standard procedure; Method of Statement (MOS) and Inspection Test Plan (ITP) for Tank 2 Major Maintenance and Repair include Tank Jacking activity.

Seconded to Warga Hikmat Kejuruteraan as a QA/QC Engineer during Tank 2 Major Maintenance and Jacking at Esso Port Dicson.Assist a WHK to establish MOS(Method of Statement), monitoring QA/QC activity,prepare the repair procedure and welding procedure to replace a bottom plate,annular plate,pontoon support leg,cut and re-install door sheet,replacement of marine suction flange,jacking and review all document according to API653 specification required.

Seconded to Warga Hikmat Kejuruteraan as a QA/QC Engineer during Tank 14 Repair and Conversion of product at Esso Port Dicson.Assist a WHK to establish MOS(Method of Statement), monitoring QA/QC activity,prepare the repair procedure and welding procedure to patch a bottom plate and rectify a slanted support column and install a steam coil.Review all related document according to API653 specification required.




Jan 2007
Seconded to Petronas Penapisan Melaka Sdn Bhd as Static Equipment Inspector during PSR-1 Turnaround 2007.Responsible to carried-out inspection and monitoring repair on 6nos of plat forming reactor/CCR.

Jan 2007
Seconded to EPEMSB, as Plant and Piping Inspector for Corrosion under Insulation assessments. Prepare data and selection of NDT activities for Ethylene and Polyethylene plant. Identify and locate CUI location as per API 570 Process Piping. Interpret, reviewed and justify Computerize Radiography film and analyze data for RBI baseline purposed.

November 2006 to Dec 2007
Seconded to Ethylene Polyethylene Malaysia Sdn Bhd (EPMSB) as Plant and Piping Inspector for certificate of fitness (CF) extension.To perform and prepare final report and compilation of all ndt report before submission to DOSH.

Seconded to EPEMSB as Static Equipment Inspector during Boiler B shutdown. To performed internal and external inspection activities and prepare inspection documentation for DOSH inspection. To ensure that all the welding and associated actions are carried out in accordance with procedure or work being carried out for repair work.

August 2006 to October 2006
Seconded to Karachaganak Plant Operating, Kazakhstan as Plant and Piping Inspector for KPC,Unit 1,Unit 2 and Unit 3 Shutdown.To perform inspection and advise to local inspector during prepare final report and compiling of all ndt report.

October 2005 tol August 2006
Seconded to EPEMSB, as Plant and Piping Inspector for Corrosion Under Insulation assessment. Prepare data and selection of NDT activities for Ethylene and Polyethylene plant. Interpret, reviewed and justify Computerize Radiography film and analyze data.

Seconded to EPEMSB as Static Equipment Inspector during Furnace F-105 Shutdown and monitoring internal insulation replacement work. To performed internal and external inspection activities and prepare inspection documentation for DOSH inspection.

Seconded to EPEMSB, as Welding/QC Inspector for Fuel Gas Piping Modification for furnace F-102.

August 2005
Seconded to Central Sugar Refinery –CSR Shah Alam as a third party inspector to verified of 50meter Stainless Steel Chimney accordence to client reference code. Review inspection documents,conduct external and internal inspection and planned for remedial works and recommendations for future monitoring.To propose repairs/procedures for repairs of Chimney.Review NDT reports and comment on action to be taken.

Seconded to Malaysia LNG Sdn Bhd, Bintulu as Videoscope Inspector during Boiler 1F-1520 August 2005. To performed internal visual inspection and editing image through CCTV and prepare preliminary and final report to client to reviewed.

Seconded to Raytech-Baxy, Sungai Petani as Boroscope Inspector during factory process piping installation. To performed internal visual inspection of small bore stainless steel pipe and editing image through CCTV and prepare preliminary and final report to client to reviewed.


July to August 2005
Seconded to Petronas Fertilizer Kedah Sdn Bhd as Static Equiment Inspector during PFKSB Turnaround 2005. To performed internal and external inspection activities on static equipment and others related equipment.

June to July 2005
Seconded to Optimal Chemical Sdn Bhd as Static Equipment Inspector during Furnace Emergency Shutdown. To performed internal and external inspection activities.

May 2005
Seconded to Petronas Fertilizer Kedah, as Static Equipment Inspector during External Inspection at PFKSB. To performed external inspection activities.

April – May 2005
Seconded to Petronas Penapisan Terengganu Sdn Bhd as Static Equiment Inspector during PPTSB Turnaround 2005. To performed internal and external inspection activities on static equipment and others related equipment.

October 2004 – April 2005
Seconded to Petronas Fertilizer Kedah, as QC/Plant and Piping Inspector during PFK plant extention Feed Gas CO2 Removal Unit project. To performed inspection activities and to monitor welding and installation activities on static equipment and pipings.Prepere final documention and punch list.Involved in plant pre-commisionig and commisioning.

September – October 2004
Seconded to Malaysia LNG Sdn Bhd, Bintulu as Static Equipment Inspector during Module 6 DOSH Shutdown 2004. To performed inspection activities and to monitor welding activities on static equipment and other related associate pipings.

May – June 2004
Seconded to Petronas Gas Berhad as Third Party Inspector performed inspection activities onto DOSH registered equipment during Boiler Shutdown May 2004 at CUF Gebeng, Kuantan.

Seconded to CUF, Gebeng as Static Equipment Inspector during boiler tubes repair.


April 2004
Seconded to Petronas Penapisan Melaka Sdn Bhd as Static Equipment Inspector during PSR-2 Phase 3 Turnaround 2004.

January 2004
Seconded to Petronas Fertilizer Kedah as Hardness Test & Holiday Test Technician during PFK Shutdown Jan 2004.

Seconded to Petronas Fertilizer Kedah as Videoscope Inspector during Sg. Line Rectification Work. To perfomed internal visual inspection and editing image through CCTV and prepare preliminary and final report to client to reviewed.

August 2003
Seconded to Malaysia LNG Sdn Bhd, Bintulu as Static Equipment Inspector during MLNG Module 5 Shutdown August 2003. To performed inspection activities on static equipment and other related equipment.

July to Aug 2003
Seconded to Petronas Penapisan Melaka Sdn Bhd (PPMSB) as UT Inspector during PSR-2 2003 Phase 2B Turnaround. To performed Ultrasonic Thickness Measurement activities at PSR-2 Area 2A.

July 2003
Seconded to Esso Malaysia Bhd as Vacuum Box Test Inspector during Tank 24 project. To witness Vacuum Box Test activities at Esso Malaysia Bhd, Port Dickson.

Seconded to Optimal Chemical Sdn Bhd as Videoscope Inspector during C-6811, C-6404B Equipment Shutdown. Carried out internal visua; inspection and editing image through CCTV and prepare preliminary and final report to client to reviwed.

Seconded to CUF, Kerteh as Videoscope Inspector during ASU I, Cogen B Turnaround 2003. To perfomed internal visual inspection and editing image through CCTV and prepare preliminary and final report to client to reviewed.

April to May 2003
Seconded to Malaysia Liqufied Natural Gas Sdn Bhd, Bintulu as Static Equipment Inspector during MLNG Module 1 DOSH Shutdown April 2003. To performed inspection activities on Static Equipment and other related equipment.

April 2003
Seconded to Chemitreat (M) Sdn Bhd as Holiday Test Inspector during EPCC of Waste Water Stripping Unit & Guard Pond project. To witness Holiday Test activities on piping at Petronas Fertilizer Kedah (PFK).

Jan - February 2003
Seconded to Petronas Ammonia as Third Party Inspector performed Eddy Current testing activities onto DOSH registered equipment during PASB Shutdown February 2003 at Kerteh Terengganu.

Seconded to Optimal Chemical as Plant Inspector performed Inspection activities during Olefins Turnaround Jan/Feb 2003 onto static equipments. To performed field Inspection, Photography report and preparation of final documentation prior submission to client Inspection Engineer.


October 2002
Seconded to Petronas Gas Berhad as Third Party Inspector performed Holiday testing activities onto DOSH registered equipment during UPV Shutdown October 2002 at CUF Gebeng, Kuantan.

September 2002
Seconded to Petronas Gas Berhad as Videoscope Inspector performed Videoscopic Inspection activities onto HRSG'C' F2-211C01 economizer tubes during Boiler Shutdown September 2002 at CUF Gebeng, Kuantan.
Seconded to Petronas Gas Berhad as Third Party Inspector performed Holiday testing activities onto DOSH registered equipment during UPV Shutdown September 2002 at CUF Gebeng, Kuantan.

Seconded to Petronas Gas Berhad as Third Party Inspector performed Holiday testing activities onto DOSH registered equipment during UPV Shutdown September 2002 at Centralized Utility Facility Kerteh, Terengganu.

Seconded to Proton Casting Plant as a MPI Inspector to performing inspection onto engine and cassis component Sept 2002.

June – August 2002
Seconded to Petronas Penapisan Terengganu Sdn Bhd / KR-2 as UTTM Inspector during performed thickness measurement activities onto static equipment for periodically corrosion monitoring and RBI data analysis.

Seconded to Petronas Gas Berhad as Plant Inspector performed Inspection activities during GPP4 Turnaround June/ July 2002 onto static equipments, structures and pipings at GPP Complex A, Kerteh, Terengganu. To performed field Inspection, Photography report and preparation of final documentation prior submission to client Inspection Engineer.

Seconded to Shell Refinery Company, Port Dickson as a NDT Technician during LRCC Turnaround 2002 to performed Dye Penetrant Testing perform on Pressure Vessel, Orifice Chamber and Reactor.

April 2001 – June 2002
As Ultrasonic Inspector seconded to Petronas Fertilizer Kedah during PFK Turnaround 2002. Inspected all selected joints of equipment welding integrity. To record nay abnormalities and flaw detected during testing or any singed of corrosion severity and liaise with PFK Inspection Coordinator on action required of the equipment in line with D.O.S.H requirements. Compiled the formal report in orderly manner and make a proposal for repair activities.

Seconded to Petronas Gas Berhad as Static Equipment Inspector performing Inspection activities during GPP-1 & KCS-B May/June 2002 Turnaround at Kerteh, Terengganu.

Seconded to Petronas Gas Berhad – CUF as Videoscope Inspector performed Videoscopic Inspection activities onto HRSG'A' F2-211A01 economizer tubes during Boiler Shutdown Feb 2002 at CUF Gebeng, Kuantan.

Seconded to Petronas Gas Berhad –CUF as Videoscope Inspector performed Videoscopic Inspection activities onto HRSG'C' F1-211C01 and HRSG'D' F1-211D01 boiler tubes during Boiler Shutdown Feb 2002 at CUF Kerteh, Terengganu .

Seconded to Petronas Gas Berhad as Assistant Plant Inspector performed general plant corrosion survey activities onto static equipments, structures and pipings at GPP Complex B, Santong, Terengganu. To assist Senior Plant Inspector on field Inspection, Photography report and preparation of final documentation prior submission to client Inspection Engineer.

Seconded to PPTSB/KR-2 as an UTTM Inspector during performed thickness measurement activities onto static equipment for periodically corrosion monitoring and RBI data analysis.

Seconded to Petronas Gas Berhad Complex A as Data Logger for thickness measurement updating data entries during 2001 schedule static Equipment UTTM monitoring activities.

Seconded to Petronas Gas Berhad as Plant Inspector performed Inspection activities during GPP- 2 Shutdown Oct 2001 onto static equipments, structures and piping’s at GPP Complex A, Kerteh, Terengganu. To performed field Inspection, Photography report and preparation of final documentation prior submission to client Inspection Engineer.

Seconded to Petronas Penapisan Terengganu Sdn Bhd as UTTM Inspector during performed thickness measurement activities onto Boiler Shutdown.

Seconded to Petronas Ammonia Sdn Bhd as Assistant NDT Inspector during obtained NDT Inspection activities onto static equipment Warranty Shutdown.

Seconded to MTBE/POLYPROPLYENE as Assistant Welding Inspector obtained Videoscopic Inspection activities onto AFC, Exchangers, Boiler during MTBE/PP(M) S/B 2001 Shutdown.

Seconded to Petronas Penapisan Melaka as Assistant NDT Technician for CHEVRON/CORNOCO Baseline corrosion monitoring onto selected critical pipelines program.

Seconded to Esso (M) Sdn Bhd Port Dickson as Assistant NDT Technician/Inspector.

Seconded to Sun Boiler (M) Sdn Bhd Shah Alam as Assistant NDT Technician/ Inspector during presure vessel fabrication works.

Seconded to Petronas Penapisan Terengganu Sdn.Bhd. as Assistant NDT Technician / Inspector during KR-2 Warranty Shutdown and maintenance schedule inspection.
Comments
Scope of work :

• To ensure that all the welding and associated actions are carried out in accordance with procedure or work being carried out.
• To prepare final documentation, welding summary and filing of Reports in accordance to client reporting and documentation system.
• To conducted PQR and WQT upon requested by client for such project involved
• To prepare WPS/ Welding Repair Procedure as and when required.
•To monitor all welding activities before, during and after welding.
•To performed Ultrasonic Thickness Measurement, Magnetic Particle Inspection, Red Dye Penetrant Inspection, Videoscopic Inspection, Holiday Testing and Hardness Testing for any assignment.
•To monitor all welding activities before, during and after welding.
•To prepare final documentation, welding summary and filing of Reports in accordance to client reporting and documentation system.
•To performed report presentation session to client representative upon completion of works and brief on inspection finding and raise technical recommendation
Evident Ultrasonic Inspection Equipment