Tecscan
QA-QC WELDING,PIPING and NDT INSPECTOR (CSWIP3.1 Welding Inspector)

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: India
Status:
I am willing to Travel.
I am on a job and will finish soon.
Currently working but always looking.
I need a job as soon as possible.
I am willing to work overseas.
I prefer temp jobs.
I prefer permanent jobs.
Certifications
CSWIP3.1 Welding Inspector
ASNT NDT LEVEL II (SNT-TC-1A)
Radiographic Film Interpretation (RTFI)
ASNT NDT LEVEL II (SNT-TC-1A)
Ultrasonic Testing (UT)
ASNT NDT LEVEL II (SNT-TC-1A)
Magnetic Particle Testing (MPT)
ASNT NDT LEVEL II (SNT-TC-1A)
Liquid Penetrant Testing (LPT)
ASNT NDT LEVEL II (SNT-TC-1A)
Visual Testing (VT)
AUTOCAD
Education
Gujarat University JUNE-2008 Diploma In Mechanical Engineering
Gujarat University MAY-2005 Computer Aided Mechanical Drafting
Gujarat University APRIL/MAY- 2003 H.S.C (ARTS)
Gujarat University APRIL/MAY- 2000 S.S.C
Experience
06. WORK EXPERIENCE DETAILS:
Company Sterling Oil Exploration and Energy Production Company Limited (SEEPCO) From July 2019 To Till the date
Location Nigeria Postion Held Technical Auditor (Mechanical)
Brief Description of Responsibilities:

1) Ensure the inspection of Gas and Crude oil pipeline and piping as per the project specification and as per approved procedures and as per the approved ITP. (Inspection Test Plan)
2) Ensures that all welding consumable and welds meets the Project Requirements and in accordance to the WPS.
3) Technical Auditing at Pre-construction stage, during and post construction stages, Invoice verification, Quality and Quantity surveying of pipeline and piping construction contractor groups to resolve any deviations/discrepancies. Constant coordinating with sub-vendors field quality teams.
4) Carry out vendor drawing review, provide technical assistance to team member and other groups, co-ordination with client, vendor and inter department for input data.
5) Performs Actual Site Line Checks and Verification as per Approved Isometric drawings and P & ID drawings.
6) Witnessing of the performance of welder WQT and PQR for Pipeline and Piping as per ASME SEC – IX,API-1104.
7) Reviewing of PWHT charts.
8) Visual Inspection of piping joints.
9) Witnessed NDT Inspection (MPI, PT, UT) on different types of Pressure vessels, structure, piping, Pipeline, nozzles, as per ASME section - V, ASME section - VIII, Division – 1 and ,API – 1104, ASME B31.1,ASME B-31.3,ASME SEC- I, ASME SEC – IX , AWS D1.1 EN Standard.
10) Interpretation of different kind of techniques of Radiography films.
11) Inspections of received material.
12) Control calibrated Measuring and Test Equipment’s used on the project.
13) Implement the Project Construction Quality Program at site.
14) Implement the Quality Control Intervention points on the Inspection and Test Plans (ITP) (Surveillance, Witness, Hold Point and Record Review).
15) Reviewing the pipeline and piping completed works packages quantity and cleared it for invoicing.
16) Reviewing Final Dossier documents of Tank and Piping as per ITP and cleared it for invoicing.
17) Witness Air Blowing, Hydro Test, Service Test, Pneumatic Test, Pigging and Flushing for Pipeline and Piping.
18) Ascertains that Safety for Welding, Testing and Related Activities are being implemented
19) Reviewing of quality plans / ITPs, Process Maps, Work Instructions and inspection documents.

Company TUV Rheinland Arabia LLC From October 2012 To May 2019
Location Jeddah Postion Held QA-QC WELDING,PIPING and NDT INSPECTOR
Brief Description of Responsibilities:
1) Knowledge of Welding Processes (SMAW, GTAW & SAW), Welding Consumables, Welding Symbols, Welding Discontinuities.
2) Conducted surveillance of Welding, NDT, PMI and PREHEAT,PWHT Activities on Alloy materials (P91, P22, P11) and Subcontractors Designated Area of Responsibility (STEAM PIPING) as per WPS and as per codes requirements ASME section - V, ASME section - VIII, Division – 1 and ,API – 1104, ASME B31.1,ASME B-31.3,ASME SEC- I, ASME SEC- IIA , ASME SEC- IIC, ASME SEC – IX , ASME B36.10, B16.10,AWS D1.1,AWS D10.10, API- 5L, EN Standard.
3) Inspections of received material as per code.
4) Verify welding consumable as per ASME SEC- IIC.
5) Monitoring of Electrode and Flux baking and holding.
6) Carry out pre inspection (Joint preparation root gap, preheat) on process root penetration, interpass temperature and weld reinforcement) and post inspection (Visual Inspection) of the P91 material welding activity.
7) Checking fit-up and dimensions as per drawing and specifications and Job release for welding.
8) Visual Inspection of piping and pipeline joints.
9) Interpretation of different kind of techniques of Radiography films.
10) Preparing technical reports and quality reports of NDT & QC inspection.
11) Review and Coordination of NDE and Outstanding Inspection.
12) Reviewing Test results and reporting same to the senior inspector or supervisor.
13) Carry out inspection as per ITP.
14) Witnessing the Welder Qualification test, PQR test as per WPS documents.
15) Witnessing of the performance of welder WQT and PQR for different alloy materials and review the reports as per ASME SEC – IX.
16) Witnessing and Reviewing of Preheating, PWHT chart of Alloy material.
17) Carry out inspection of piping as per isometric drawing and P & ID drawings.
18) Implement the Project Construction Quality Program at site.
19) Implement the Quality Control Intervention points on the Inspection and Test Plans (ITP) (Surveillance, Witness, Hold Point and Record Review).
20) Witnessed NDT Inspection (MPI, PT, UT) on different types of Pressure vessels, structure, piping, Pipeline, nozzles, Storage Tank, Shafts, Autoclave ,Boiler, Shipbuilding Structure, Park rides NDT inspections as per ASME section - V, ASME section - VIII, Division – 1 and ,API – 1104, ASME B31.1,ASME B-31.3,ASME SEC- I, ASME SEC – IX , AWS D1.1 EN Standard.
21) Co-ordination with production and Q.C. inspector to achieve best result.
22) Carryout inspection of Fire water network lines piping as per isometric and P & ID drawings and prepare punch list.
23) Ensures that all welds meets the Project Requirements and in accordance to the WPS.
24) Control calibrated Measuring and Test Equipment’s used on the project.
25) Receives Test Packages for Line Checking, Document Reviews and Punch Listings.
26) Reviewing Final Dossier documents of Tanks and Piping.
27) Performs Actual Site Line Checks and Verification as per Approved Isometric drawings and P & ID drawings.
28) Monitors, Records and Clearing of QC Related Punch Items.
29) Witness Air Blowing, Hydro Test, Pneumatic Test, Flushing and Pigging.
30) Ascertains that Safety for Welding, Testing and Related Activities are being implemented.
31) Third party (TPI) Coating inspection Surface Preparation, Soluble Salt Contamination Test, Dust Contamination Test, Adhesion Test, Visual inspection, DFT Verification, Holiday /Pinhole Test, Final Clearance as per Inspection Test Plan (ITP)
32) Third Party (TPI) of SAWH line Pipes (Submerged Arc Welding Helical) as per ITP.


Projects:
1) Project: Yanbu Madina Water Transmission System (YMWTS) (Saline Baha water conversion corporation)(SWCC)
Client : Group Five Pipe Saudi Ltd Co, Saudi Arabia
Position: QA/QC Welding and Piping Inspector TPI (Third Party Inspector) (April to May 2019)

1. Conduct SAWH line pipe inspection as per ITP.(Inspection Test Plan)
2. Review Hydro test, Heat Treatment, on-destructive Testing, Hot Forming, Expansion and other Procedures and conduct Inspection as per procedure.(API 5L)
3. Witness first day production Test as per all testing requirements.
4. Witness of the Skelp welding and Qualification of Welder.
5. Raw material inspection as per MTC.
6. Monitoring of Pipe SAWH Welding (Submerged Arc Welding Helical) Parameters required as per WPS.
7. Monitoring of SAWH flux baking and Holding.
8. Visual examination of welding defects in ID and OD.
9. Witness of Hydro testing of Pipes.(Calibration of Pressure Gauge, Leakage)
10. Monitoring of Automatic UT inspection (AUT) and review the report.(Review Every 4 Hour calibration record)
11. Witness Manual Ultrasonic Testing of Pipe ends and Repaired welds area.
12. Review of X-ray films for pipe ends weld and Weld seams.
13. Witness final inspection of Surface condition, Straightness, End Finish, Bevel Angle, Root Face, Thickness, Square ness, Residual Magnetism.
14. Witness product analysis of pipe chemical composition and review report.(Per 100 Pipe One Sample)
15. Witness marking for Test Piece samples for destructive testing and destructive tests like Tensile test of base metal, Tensile test of weld, Macro & Hardness test, Impact Test, Guided Bend Test (Root and Face), Drop Weight Tear Test, Residual stress and review the reports as per procedures.(One sample Per Heat No)
16. Monitoring marking and stenciling of Pipe as per API monogram and Color coding.
17. Review final documentation with Verification & compliance of Inspection and test reports for Final Dossier.
2) Project: Waad Al Shamal Power Plant Project,Turaif Saudi Arabia
Client : ABENER
Position: QA/QC Welding and Piping Inspector ( June 2017 to April 2019)
1. Conducted surveillance of Welding, NDT, PMI and PREHEAT,PWHT Activities on Alloy materials (P91, P22, P11) and Subcontractors Designated Area of Responsibility (STEAM PIPING) as per WPS and as per codes requirements ASME section - V, ASME section - VIII, Division – 1 and ,API – 1104, ASME B31.1,ASME B-31.3,ASME SEC- I, ASME SEC- IIA , ASME SEC- IIC, ASME SEC – IX , ASME B36.10, B16.10,AWS D1.1,AWS D10.10, EN Standard.
2. Conduct material inspection as per ASME SEC- IIA, B36.10.
3. Verify welding consumable as per ASME SEC- IIC.
4. Carryout inspection of fire water lines piping as per isometric and P & ID drawings and prepare punch list.
5. Ensures that all welds meets the Project Requirements and in accordance to the WPS.
6. Witnessing the Welder Qualification test, PQR test as per WPS documents.
7. Control calibrated Measuring and Test Equipment’s used on the project.
8. Carry out inspection of piping as per isometric drawing and P & ID drawings.
9. Implement the Project Construction Quality Program at site.
10. Ensures that repairs are done correctly and accurately to comply with the Project Specification.
11. Implement the Quality Control Intervention points on the Inspection and Test Plans (ITP) (Surveillance, Witness, Hold Point and Record Review).
12. Carry out firefighting line inspection as per isometric drawing and P & ID drawings.
13. Receives Test Packages for Line Checking, Document Reviews and Punch Listings.
14. Performs Actual Site Line Checks and Verification as per Approved Isometric and P & ID drawings.
15. Monitors, Records and Clearing of QC Related Punch Items.
16. Review and Coordination of NDE and Outstanding Inspection.
17. Reviewing Final Dossier documents of Tank and Piping.
18. Witness Air Blowing, Hydro Test, Service Test, Pneumatic Test and Flushing.
19. Ascertains that Safety for Welding, Testing and Related Activities are being implemented.

3) Project: Saudi Electricity Company (SEC), Qurayyah, Saudi Arabia
Client : Saudi Electricity Company (SEC) HRSG (Shut Down Project)
Position: Welding and NDT Inspector (From May 2017 )
1. Visual inspection of welds of piping and pressure drums.
2. Performed Ultrasonic Thickness Test (UTT) of Boiler tubes, Nozzles and Piping.
3. Ultrasonic Thickness Test (UTT) of HP and LP pressure drums.
4. Magnetic Particle testing of weld joints of HP and LP pressure drums.

4) Project: Yanbu Madina Phase – 3 Water Transmission System, (Pipeline) Yanbu , Saudi Arabia
Client : Saline Baha water conversion corporation(SWCC)
Position: NDT Technician (From Aug 2016 to to Jan 2017)
1. Performed UT (lamination checking).
2. Performed MPI for pipe Weld Edge Preparation (WEP).
3. Performed UT, MPI and DPT of welded pipes.
4. Interpretation of Radiographs.

5) Project : SPCC Tahama Cement Plant , Saudi Arabia
Client : SPCC Tahama Cement Plant
Position: NDT Technician (July 2016)
1. Performed Ultrasonic testing of KILN butt weld Joints circular and longitudinal seam.
2. Visual inspection of welds.

6) Project: SEPCO ENVIRONMENT, AL ABHA , Saudi Arabia
Client : SEPCO
Position: NDT Technician (Nov 2015)
1. Performed Visual inspection of Welds of AUTOCLAVE.
2. Performed Ultrasonic Thickness Test (UTT) of AUTOCLAVE.
3. Performed Ultrasonic testing of weld butt Joints circular and longitudinal seams of AUTOCLAVE.
4. Magnetic Particle testing of weld butt Joints circular and longitudinal seams of AUTOCLAVE.

7) Project: Arabian Cement Company, Saudi Arabia
Client : Arabian Cement Company
Position: NDT Technician ( March 2015)
1. Performed UT on Shaft.
2. Performed DPT on Shaft.



8) Project: AL- Taif – AL Baha Water Transmission System, (Pipeline) AL- Taif, Saudi Arabia
Client : Saline Baha water conversion corporation(SWCC)
Position: NDT Technician (From Jan 2015 to Aug 2016)
1. Performed UT (lamination checking).
2. Performed MPI for pipe Weld Edge Preparation (WEP).
3. Performed UT, MPI and DPT of welded pipes.
4. Interpretation of Radiographs.

9) Project: SABIC, Yanbu , Saudi Arabia
Client : SABIC
Position : NDT Inspector.(UT,MPT,DPT,VT) (From Oct 2014 to Dec 2014)
1. Inspection of Storage Tank.
2. Visual inspection of Tank welds.
3. Inspection of Tank Corrosion.
4. Ultrasonic Thickness Checking (UTT).
5. Performed UT, MPI and DPT of Nozzles, Valves and Welds.

10) Project: Yanbu Madina Phase – 3 Water Transmission System, (Pipeline) Yanbu , Saudi Arabia
Client : Saline Baha water conversion corporation(SWCC)
Position: NDT Technician (From Jun 2013 to Oct 2014)
1. Performed UT (lamination checking).
2. Performed MPI for pipe Weld Edge Preparation (WEP).
3. Performed UT , MPI and DPT of welded pipes.
4. Interpretation of Radiographs.

11) Project : Ras Alkhair-Riyadh Water Transmission, (Pipeline) Saudi Arabia
Client : Saudi Services for Electro Mechanic works Co. Ltd.(SSEM)
Position : Painting and Coating inspector(FBE and Liquid coating inspection)
(From Feb 2013 to May 2013)
Inspection of CS Pipes and Flanges FBE and Liquid coating inspection
1. Surface Preparation.
2. Soluble Salt Contamination Test.
3. Dust Contamination Test.
4. Adhesion Test.
5. Visual inspection.
6. DFT Verification.
7. Holiday /Pinhole Test.
8. Final Clearance.

12) Project : AL- Taif – AL Baha Water Transmission System, (Pipeline) AL- Taif, Saudi Arabia
Client : Saline Baha water conversion corporation(SWCC)
Position : NDT Technician (Oct 2012 to Jan 2013)
1. Performed UT (lamination checking).
2. Performed MPI for pipe Weld Edge Preparation (WEP).
3. Performed UT, MPI and DPT of welded pipes.
4. Interpretation of Radiographs.




Company Larson & Toubro Limited, Ship Building Division From September 2010 To September 2012
Location Surat, Gujarat, India Postion Held Quality Control & NDT Inspector
Brief Description of Responsibilities:
Worked as Quality Control and NDT Inspector at following sites behalf of INSPECNDT, SURAT

1) Larson & Toubro Limited – Heavy Engineering Division (LEMF), Hazira, Surat.
As a NDT TECHNICIAN performed inspection of Reactor, Re-Generator, Gasifires, Pipe joints, Nozzles, Flanges and Valve body.
1. Performed Visual Inspection, Liquid Penetrant Testing, Magnetic Particle Testing and Thickness Measuring by Ultrasonic Test Gauge.
2. Performed inspection of Weld Edge Preparation (WEP), Chip back welding, Complete Welding, Inspection after Post Welding Heat Treatment, and Inspection after Hydro Testing and Other Materials.

2) MRPL(Mangalore Refinery of Petro-Chemical Ltd. Mangalore.(FOR INSPEC NDT)
Performed Visual inspection, Liquid Penetrant Testing, Magnetic particle Testing, Ultrasonic Testing and thickness measuring by Ultrasonic Test Gauge for Reactor and Re-Generator errection projects.
As a NDT Inspector I have done inspection of Reactor, Re-Generator, Gasifires, Pipe joints, Nozzles, Flanges and Valve body.
1. Performed Visual inspection Liquid Penetrant Testing, Magnetic particle testing, and Ultrasonic Testing and thickness measuring by Ultrasonic Test Gauge.
2. Performed inspection of Weld Edge Preparation (WEP), Chip back welding, Complete Welding, Inspection after Post Welding Heat Treatment, and Inspection after Hydro Testing and Other Materials.
3) Larson & Toubro Limited - Ship Building Division, Hazira, Surat.
Quality control and NDT Inspection work in shipyard of ROLLDOCK and BIGLIFT projects.
1. Inspection of received materials.
2. Visual inspection of material surface & weld joint.
3. Check thickness of material using ultrasonic thickness meter.
4. Liquid penetrant testing of material and weld joints.
5. Checking fit-up and dimensions as per drawing and specifications and Job release for welding.
6. Performed the entire Non-Destructive testing requirement as per rules of GL and LR and their acceptance criteria.
7. NDT Inspection (MPI, PT, UT) on different types of ship parts like Crane Booms, spreader beams, gantries, crane pedestal other erection joints, and other weld joints and job surface under supervision of clients inspectors as per EN-STANDARDS and IACS.
8. Interpretation of Radiographs.
9. Performed Liquid Penetrant Testing of weld joints single hatch pocket assembly, Dual Pocket assembly, channels made from plates and radius portion of angles, pipe-spools and piping erection joints.
10. Magnetic particle testing of weld joints.
Performed Magnetic Particle Test of Crane Booms, spreader beams, gantries, crane pedestal, other erection joints, and other weld joints and job surface under supervision of client inspectors of ROLLDOCK and BIGLIFT projects and third party inspection agency of GL (Germanischer Lloyd) and LR (Lloyd's Register).
11. Ultrasonic testing of weld joints.
Perform Ultrasonic testing of different types of weld joints in ROLLDOCK and BIGLIFT container vessels ship projects.
12. Reviewing Test results and reporting same to the senior inspector or supervisor and also Third Party and Client.
13. Done the documentation work related to NDT for QA.
Company RELIANCE INDUSTRIES LTD From April 2010 To May 2010
Location Nagothane , Mumbai, India Postion Held Welding and NDT Inspector
Brief Description of Responsibilities:
Worked as Quality Control and NDT Inspector at following sites behalf of MODY TECHNICAL CONSULTANCY, SURAT
My working responsibility as Welding and NDT Inspector during the shutdown at RELIANCE INDUSTRIES LTD. NAGOTHANE, MUMBAI. I was responsible for welder qualification and pipe fabrication related works like checking the material for fabrication Pipes,Flanges,Reducer as per specification and Inspection Test Plan (ITP), fit up, Visual inspection, witnessed DPT, MPT and UT of welded pipes, witnessed Hydrotest and also checked the requirement for RT and report to the responsible supervisor.
Company Larsen And Toubro Limited, Heavy Engineering Division From November 2008 To January 2010
Location Surat, Gujarat, India Postion Held Design Engineer
Brief Description of Responsibilities:
Worked as Design Engineer at following sites behalf of S.N Cadding Services.

My working responsibility was Drafting work required as per DCR (Drawing Change Requirement)
and preparing planning drawings.

Mistras Group