Mistras Group
Certified - RI PCN - WI MIGAS - CSWIP 3.1 (Attended)

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Indonesia
Status:
I am willing to Travel.
Currently working but always looking.
I am willing to work overseas.
I prefer temp jobs.
I prefer permanent jobs.
Certifications
QUALIFICATION AND COURSE/TRAINING ATTENDANCE
- CSWIP 3.1 (Attended) Conducted by TWI and PT Dua Utama Jaya - Batam - Kepri - Indonesia
- Certified Radiographic Interpreter (CSWIP 3.4/PCN level-2) - PCN No: 304324, CERT NO.: FO08S3621113 - Certified by BINDT Certification 1 Spencer Parade, Northampton NN1 5AA, UK (www.bindt.org)
- Certified Welding Inspector (MIGAS) - Cert No.274/WI-XII/I/2008 – Certified by General Directorate Oil and Gas (MIGAS), Ministry of Mines and Energy Indonesia (www.ikbalmyos.com)
- Certified Piping Inspector – Certified by Alumnus of Andalas University
- HSE Awareness Course Conducted by SMOE – Total E&P Indonesie
- Other Training/Course attended: English Course, Work as a Team, Leading a Team Quality Improvement Course, Quality Service Skills, Interpersonal Effectiveness through Communication
Education
Degree University with major Mechanical Engineering
Experience
Certified - RI PCN - WI MIGAS – CSWIP 3.1 (Attended)
Welding Inspector
Construction, installation of oil and gas processing, Structural, Piping and Pressure Vessel Fabrication


WORKS EXPERIENCE
Company : MC CONNEL DOWELL
Period of service : May 2009 until Now
Position : QA/QC Inspector
Project Involved : SINGAPORE PARALLEL TRAIN (SPT)-PIPE RACKS (PARs/SBRs) &
ASSOCIATED PIPING
Owner : EXXONMOBIL CHEMICAL ASIA PACIFIC PTE LTD
Duties & Responsibility :
- Responsible and directly report to the QA/QC Manager
- Reading and understanding of ITP, WPS, Project Specification (client spec) & Code Standard
Applicable
- Control & manage all NDT activities (Piping, Structural)
- Establishing that a procedure is available, has been approved as required by the
appropriate authority and is being employed in production.
- Conducted welder qualification test (WQT) and running PQR if any
- Review and sign welders certificate, welders stamp and welders list
- Prepared non conformance record (NCR) if any case during fabrication & erection
- Control line work preparation and performing cleaning, flushing and hydro testing
- Control punch works check list should be touch up, grinding, repairing prior to final
Inspection with client or third party
- Welding inspection before, during and after welding completed according Welding Procedure Specification (WPS) requirement’s project including control Preheating
- Witness NDT as requirement’s, Conducted PWHT, Hardness test as required
- Radiographic film interpretation
- Internal quality audit
- Attend coordination meeting with client

Company : SMOE INDONESIA
Period of service : Aug 2008 until April 2009
Position : QC- NDT Coordinator
Project : TUNU FIELD DEVELOPMENT PROJECT, PHASE 11, TP 11 N / EPSC
11+12 (NCP2 & NMP3 MODULE)
Owner : TOTAL E & P INDONESIE
Duties & Responsibility :
- Responsible and directly report to the QA/QC Manager
- Reading and understanding of ITP, WPS, Project Specification (client spec) & Code Standard applicable
- Control & manage all NDT activities (Piping, Structural, Pressure Vessel)
- Establishing that a procedure is available, has been approved as required by the appropriate authority and is being employed in production.
- Conducted welder qualification test (WQT) and running PQR if any
- Review and sign welders certificate, welders stamp and welders list
- Prepared non conformance record (NCR) if any case during fabrication & erection
- Control line work preparation and performing cleaning, flushing and hydro testing
- Control punch works check list should be touch up, grinding, repairing prior to final Inspection with client or third party
- Welding inspection before, during and after welding completed according Welding Procedure Specification (WPS) requirement’s project including control Preheating
- Witness NDT as requirement’s, Conducted PWHT, Hardness test as required
- Radiographic film interpretation
- Control validate document in Quality Control System (QCS)
- Internal quality audit
- Attend coordination meeting with client

Company : ROTARY ENGINEERING
Period of service : Mar 2008 until Aug 2008
Position : QA/QC Inspector
Project : SEPC-MEG PROJECT
Owner : SHELL EASTERN PETROLEUM (PTE) LTD

Duties & Responsibility :
- Responsible and directly report to the QC Manager
- Reading and understanding of Code standard, ITP, WPS and Project Specification
- Conducted welder qualification test (WQT)
- Check fit-up prior weld and material traceability report
- Welding inspection before, during and after welding completed according Welding Procedure Specification (WPS) requirement’s project
- Prepared welding summary report and list of outstanding NDT
- Final inspection with client’s inspector or third party after welded and checks dimensional accuracy
- Request NDT as project requirement’s
- Radiographic film interpretation
- Prepared and generate report
- Attend coordination meeting with production

Company : CENDRAWASIH ANEKA
Period of service : Dec 2005 until Feb 2008
Position : QC Inspector
Project : Structural Module and Pipe Spool Fabrication

Duties & Responsibility :
- Responsible and directly report to the QC Supervisor
- Reading and understanding of Code standard, ITP, WPS and Project Specification
- Verification against documentation and markings of correctness of parent material
- Verification of correctness of welding consumables (electrodes, filler wires, consumable
inserts, gases, fluxes etc).
- Verification that dimensions, fit-up and weld preparations are in accordance with the
engineering drawings.
- Welding inspection before, during and after welding completed according Welding Procedure Specification (WPS) requirement’s project
- Prepared welding summary report and list of outstanding NDT
- Final inspection with client’s inspector or third party after welded and checks dimensional accuracy
- Request NDT as project requirement’s
- Prepared and generate report
- Radiographic film interpretation
- Attend coordination meeting with production

Organization : PT. Infineon
Period service : Dec 2003 until Nov 2005
Position : Process & Equipment Engineer
Duties and Responsibilities :
- Responsible and directly report to the Process & Equipment Engineering Manager
- Design and prepare drawing for equipment and tools fabrication (using AutoCAD)
- Designing and implementing cost-effective equipment modifications to help improve safety, reliability and throughput
- Planning and monitoring on machine maintenance schedule

Organization : PT. Thomson
Period service : Mar 1999 until Dec 2003
Position : Process & Mechanical Engineer
Duties and Responsibilities :
- Responsible and directly report to the Process & Mechanical Engineering Manager
- Design and prepare drawing of jig and fixture by using AutoCAD
- Planning and Controlling of Jig & Fixture design and fabrication
- Assembly and trial run of jig and fixture
- Designing and implementing cost-effective equipment modifications to help improve safety, reliability and throughput
- Developing a project specification with colleagues, often including those from other engineering disciplines
- Discussing and solving complex problems with manufacturing departments, sub-contractors

Assistant of Lecturer in Mechanical Engineeering Department of Andalas University - Padang
As Assistant Lecturer in Energy Conversion and Conservation Laboratory 1997/1998
As Assistant Lecturer in Metallurgy Laboratory 1996/1997
As Assistant Lecturer of course title Technical Drawing 1993/1995

Evident Ultrasonic Inspection Equipment