NDT.org

NDT.org : Resumes : QA/QC, NDT & WELDING INSPECTOR


Posted: 2/1/2006 4:49:59 PM
Resume Header/Title:

QA/QC, NDT & WELDING INSPECTOR

Country:

Philippines

Extra Info:

I am willing to Travel.
I need a job as soon as possible.
I am willing to work overseas.
I prefer permanent jobs.

 Login for contact information.
 
 
 
 
 
 
Certifications:

Philippines Welding Society Dec 6 - 10, 2005
WELDING INSPECTOR COURSE
TESDA NCR Complex East Service Road, South Superhighway
Taguig City, Metro Manila, Philippines

ľ Eurotechnology Saudi Arabia Co. May 2005 SURFACE METHOD LEVEL-2 (MT&PT)
P.O. Box 1848 Dammam 31441 K.S.A.
Tel No. (03) 815 1677 Fax (03) 841 0413

ľ Eurotechnology Saudi Arabia Co. May 2005 ULTRASONIC TESTING LEVEL-2
P.O. Box 1848 Dammam 31441 K.S.A.
Tel No. (03) 815 1677 Fax (03) 841 0413

ľ Indusrial Support Services Co. LTD June to July 2003
SURFACE METHOD LEVEL-2 (MT&PT)
P.O. Box 11501 Dammam 31643 K.S.A.
Tel No. (03) 830 2200 & (03) 830 2020

ľ Indusrial Support Services Co. LTD June 2003
ULTRASONIC TESTING LEVEL-2
P.O. Box 11501 Dammam 31643 K.S.A.
Tel No. (03) 830 2200 & (03) 830 2020

ľ Indusrial Support Services Co. LTD May 30 to June 2003
RADIOGRAPHIC TESTING LEVEL-2
P.O. Box 11501 Dammam 31643 K.S.A.
Tel No. (03) 830 2200 & (03) 830 2020

ľ National Training Course on Non-Destructive Testing January 14-29, 2002
SURFACE METHOD LEVEL-2 (MT & PT)
Philippines Nuclear Research Institute
Diliman, Quezon City, Philippines

ľ Seminar-Workshop on Improvement of Safety Sept. 6-7, 2001
Practices in Industrial Radiography
Philippines Nuclear Research Institute
Diliman, Quezon City, Philippines

ľ Seminar in Red Cross, Quezon Chapter August 6-10 2001
STANDARD FIRST AID &
BASIC LIFE SUPPORT COURSE
Mirant Philippines in Bay View Quezon

ľ Seminar in Cylinder Inspection March 2000 Shell House, Makati City, Philippines



ľ National Training Course on Non-Destructive Testing November 4-19,1999
RADIOGRAPHIC TESTING LEVEL-2
Philippines Nuclear Research Institute
Diliman, Quezon City, Philippines

ľ National Training Course on Non-Destructive Testing Aug. 23 to Sept. 8, 1999
ULTRASONIC TESTING LEVEL-2
Philippines Nuclear Research Institute
Diliman, Quezon City, Philippines

Education:

COLLEGIATE : UNIVERSITY OF PERPETUAL HELP RIZAL
Bachelor of Science in Mechanical Engineering
Graduated last : April 1998

: TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
` Mechanical and Production Engineering Technology
Graduated last : March 1995

SECONDARY : SAINT MICHAEL¡¦S INSTITUTE
Graduated last : March 1992

ELEMENTARY : SAINT MICHAEL¡¦S INSTITUTE
Graduated last : June 1982 March 1988

Experience:

PROFESSIONAL WORK EXPERIENCE:

EMPLOYER : EUROTECHNOLOGY SAUDI ARABIA Co. LTD Oct. 2003 to Nov. 27 05
Gas and Oil Field Services
P.O. Box 1848 Dammam 31441 K.S.A.
Tel No. (03) 815 1677 Fax No. (03) 841 0413

POSITION : QA/QC and NDT Inspector

JOB DESCRIPTION:

„« To ensure that the ESACO quality system is implemented and maintained in full compliance with ISO 9001:2000 and API Q1(Sixth Edition).
„« To ensure that quality control plans are in place for all existing and planned products and services.
„« To ensure the correct application and control of the API Monogram, API 5CT-0598, API 7-0420,
API 6A-0719 and API 16A-0165
„« To check plans and drawing before going to fabrication
„« Responsible for Implementation of ESACO Route Card before and after work is done
„« Responsible for issuing non conformity report (NCR) in all cases when materials, items, processes or any activity affecting quality does not conform to the specified requirements drawing, specification and procedures ect.
„« Responsible for final inspection on manufactured piece as per drawing specification
„« Responsible for calibration of measuring tools like Micrometer, Bore gauge, Depth Micrometer, Caliper ect., using MIC TRAC MT-3000 (GAGE MAKER)
„« Witness Hydro testing as per API Specification 7 Fortieth Edition.
„« Conduct threads Inspection on API 5CT (Casing and Tubing), API 7 (drill Stem Items) and Premium (NKK, VAGT, VAM, Grand Prideco, and Tenaris ect.) Connection
„« To oversee that weld preparation and design is in accordance with the procedure and assembly at tack-up stage prior to welding.
„« To witness that stress relief is carried out in accordance with the relevant welding procedure or specified standard
„« To maintain documented records at all stages of fabrication for verification and traceability.
„« Conduct receiving inspection, repair and recertification of Rotary drilling connection, Casing & tubing, wellhead & Christmas tree and drilling equipment as per DS-1 specification.
„« Conduct Film Interpretation, Ultrasonic Thickness Gauging (UTG), Penetrant Test and Magnetic particle Inspection on well heads, Mud Cross, double studded adapter, Drill collar, Reamer, stabilizer and Drill Pipe connection ect. Based on DS-1 Inspection Procedure.
„« Conduct Hardness Testing on Well head & Christmas tree, tee blocks and Flanges using Telebrinell





Page 2 of 8

PROJECT HANDLED:

Client : Al Masood Oil Industry October 2003
Al Thuqbah K.S.A.

The Project is to conduct third party inspection and verification of Magnetic particle Inspection in critical part on the single joint elevator and string elevator, coordinate schedule and time on inspection, prepare test results and time sheet for approval.

Client : Drilling and Petroleum Services CO. February 2004
Rig ¡V 04

The Project is to conduct third party inspection, welding inspection and verification of Magnetic particle Inspection in critical part of mask rig pad eye, coordinate schedule and time on inspection, prepare test results and time sheet for approval.


EMPLOYER : INDUSTRIAL SUPPORT SERVICES Co. LTD May to Oct. 2003
P.O. Box 11501 Dammam 31643 K.S.A.
Tel No. (03) 830 2200 & (03) 830 2020

POSITION : QA/QC, NDT Inspector

JOB DESCRIPTION:

„« Assigned in Jubail as a reliever NDT Supervisor
„« Conduct Welding Qualification Test on welders
„« Supervised/Coordinate NDT technician on Petrochemia Shut Down last September 2003
„« Assigned NDT Technician in Jubail United Petroleum Company (JUPC) area for NDT services

ACCOMPLISHMENT:

„« Completed project on Petrochemia shut down and ahead of schedule.
„« Certified ASNT LEVEL 2 on RT, UT, MPI and PT by Mr. Ramakristan ASNT level 3
„« Passed Aramco level 2 Radiographic and safety examination


EMPLOYER : MAETECH CORPORATION Dec. 2002 to May 2003
A De Las Alas Drive Batangas City, Philippines
Tel No. 043 723 5824 Tele Fax 043 723 5824
Email: maetech@speedsurf.pacific.net.ph

POSITION : Assistant Radiological Health and Safety Officer (ARHSO)
Technical Supervisor/NDT Inspector

JOB DESCRIPTION:

„« Supervised/Conduct Radiographic Test, Ultrasonic Test, Penetrant Test and Magnetic Particles Test
„« A serve as the Assistant Licensee¡¦s Liaison Officer recognized by the Philippine Nuclear Research Institute (PNRI) on licensing matters regarding any radioactive materials (RAM) it may possess
„« Prepare Test Results for Client¡¦s Representative review and approval
„« Assume control and institutes corrective action in emergency situation and investigate the cause of incident and determine necessary prevention action.
„« Develop and maintain up-to-date operating and emergency procedures
„« Establishes and maintains personnel monitoring program, storage facilities and leak testing program.
„« Establish and ensures compliance to radiation safety program.
„« Interpret radiographic films based on approved code by the client
„« Prepare Time Sheet and Payroll
„« Prepare Quotation, invoice and billing

Page 3 of 8


PROJECT HANDLED:

Client : SIEMENS INC. January to April 2003
Sta. Rita 1000MW & San Lorenzo 500 MW
Sta. Rita, Batangas City, Philippines

The Project is to conduct Non destructive testing in the Condenser and turbine side.
I supervised and assign NDT technician for their places as per client request for testing. Also, coordinate and monitor progress of work per day basis and prepare Test Results for Client¡¦s review and approval. Secure working permit in every used of Radioactive materials (RAM)

ACCOMPLISHMENT:

„« Completed project on Siemens Inc. Outage in Sta. Rita 1000MW & San Lorenzo 500 MW and well ahead of schedule.


EMPLOYER : SUNTECH TECHNOLOGY CORPORATION Dec. 2000 ¡V Dec. 2002
# 37 Anonas St., Project 2, Quezon City, Philippines
Tel No. 928-2011 Tele Fax (632) 928-5821

POSITION : Assistant Radiological Health and Safety Officer (ARHSO)
Technical Supervisor/NDT Inspector

JOB DESCRIPTION:

„« Supervised/Conduct Radiographic Test, Ultrasonic Test, Penetrant Test and Magnetic Particles Test
„« A serve as the Assistant Licensee¡¦s Liaison Officer recognized by the Philippine Nuclear Research Institute (PNRI) on licensing matters regarding any radioactive materials (RAM) it may possess.
„« Prepare Test Results for Client¡¦s Representative review and approval
„« Assume control and institutes corrective action in emergency situation and investigate the cause of incident and determine necessary prevention action.
„« Develop and maintain up-to-date operating and emergency procedures
„« Establishes and maintains personnel monitoring program, storage facilities and leak testing program.
„« Establish and ensures compliance to radiation safety program.
„« Interpret radiographic films based on approved code by the client
„« Prepare Time Sheet and Payroll
„« Prepare Quotation, invoice and billing


PROJECT HANDLED:

Client : SIEMENS INC. October to Dec 2002
Sta. Rita 1000MW & San Lorenzo 500 MW
Sta. Rita, Batangas City, Philippines

The Project is to conduct Non destructive testing in the Condenser and turbine side.
I supervised and assign NDT technician for their places as per client request for testing. Also, coordinate and monitor progress of work per day basis and prepare Test Results for Client¡¦s review and approval. Secure working permit in every used of Radioactive materials (RAM)







Page 4 of 8


Client : MIRANT PHILIPPINES (Boiler/turbine Unit 1 Shutdown) Sept. to Nov. 2002
Sual Power Station, Sual Pangasinan, Philippines

The Project is to Supervised/conduct Non destructive testing in different part on the boiler and turbine within 25 days shut down, I assign NDT technician for their places as per client request for testing,
Review drawing and plan specially the area to be tested by ultrasonic thickness gauging inside the boiler. Also, coordinate and monitor progress of work per day basis and prepare Test Results for Client¡¦s review and approval. Secure working permit in every used on radioactive material (RAM).


Client : MIRANT PHILIPPINES (Boiler/turbine Unit 2 Shutdown) May ¡V July 2001
Ibabang Pulo, Pagbilao, Quezon, Philippines

The Project is to Supervised/conduct Non destructive testing in different part on the boiler and turbine within 40 days shut down, I assign NDT technician for their places as per client request for testing,
Review drawing and plan specially the area to be tested by ultrasonic thickness gauging inside the boiler. Also, coordinate and monitor progress of work per day basis and prepare Test Results for Client¡¦s review and approval. Secure working permit in every used on radioactive material (RAM).
I handle project in SOUNTHERN ENERY QUEZON until they change their name to MIRANT Phils.


Client : SOUTHERN ENERGY QUEZON (Boiler Unit 1 Shutdown) Jan. to Feb 2001
Ibabang Pulo, Pagbilao, Quezon, Philippines

The Project is to Supervised/conduct Non destructive testing in different part on the boiler, I assign NDT technician for their places as per client request for testing, Review drawing and plan specially the area to be tested by ultrasonic thickness gauging inside the boiler. Also, coordinate and monitor progress of work per day basis and prepare Test Results for Client¡¦s review and approval. Secure working permit in every used on radioactive material (RAM).


Client : QUEZON POWER 2000
Mauban, Quezon, Philippines

The Project is to conduct Radiographic testing in different part on the boiler as per client request for testing. Also, coordinate and monitor progress of work per day basis and prepare Test Results for Client¡¦s review and approval. Secure working permit in every used on radioactive material (RAM).

ACCOMPLISHMENT:

„« Completed project on Mirant Philippines both in Pagbilao and Pangasinan station and ahead of schedule.
„« Completed project on Siemens Inc. Sta. Rita 1000MW & San Lorenzo 500 MW and well ahead of schedule.
„« Completed project on Quezon Power Emergency shut down and ahead of schedule.
„« Attend training for National Training Course on Non-Destructive Testing Surface Method level 2 in Philippines Nuclear Research Institute


EMPLOYER : RED CLOVER CONSULTANTS, INC. Dec. 1999 ¡V Dec. 2000
614-B Halcon St., Mandaluyong City, Philippines
Tel No. 531-2957/533-4189 Tele Fax 533-4208

POSITION : Assistant Radiological Health and Safety Officer (ARHSO)
Third Party Inspector (NDT & Welding )





Page 5 of 8

JOB DESCRIPTION:

„« Conduct Radiographic Test, Ultrasonic Test, Dye Penetrant Test and Magnetic Particles Test
In LPG Trailer, Lorry, Piping and tanks
„« A serve as the Assistant Licensee¡¦s Liaison Officer recognized by the Philippine Nuclear Research Institute (PNRI) on licensing matters regarding any radioactive materials (RAM) it may possess.
„« Conduct Welding Qualification Test on 1G,2G,3G,4G,6G position as per ASME Section IX
„« To ensure that agreed welding procedure have been applied and maintained throughout the project
„« To confirm that all welder qualification requirements have been met before employment on actual construction.
„« To oversee that weld preparation and design is in accordance with the procedure and assembly at tack-up stage prior to welding.
„« To witness that stress relief is carried out in accordance with the relevant welding procedure or specified standard
„« To maintain documented records at all stages of fabrication for verification and traceability.
„« Conduct Inspection Re-qualification on LPG Trailer and lorry Tanks as per ASME Section VIII
„« Prepare Test Results for Client¡¦s Representative review and approval
„« Assume control and institutes corrective action in emergency situation and investigate the cause of incident and determine necessary prevention action.
„« Develop and maintain up-to-date operating and emergency procedures
„« Establishes and maintains personnel monitoring program, storage facilities and leak testing program.
„« Interpret radiographic films based on approved code by the client
„« Establish and ensures compliance to radiation safety program.
„« Witness Hydro Testing in LPG Trailer, Lorry, Pipings and Tanks.

PROJECT ASSIGNED:

Client : MECHATRAND CORPORATION 2000
Tanza, Cavite, Philippines

The Project is to conduct Tank Inspection and conduct Non destructive testing as per AMSE VIII and V specification on Fabricated 2000 m^3 LPG storage tank and prepare Test Results for Client¡¦s review and approval. Secure working permit in every used of Radioactive materials (RAM)

Client : NATION GAS 2000
Sariaya, Quezon, Philippines

The Project is to conduct Non destructive testing as per AMSE VIII and V specification on Mechanical Pipe line for new fabricated 500 MT LPG storage tank and prepare Test Results for Client¡¦s review and approval. Secure working permit in every used of Radioactive materials (RAM)

Client : PRYCE GASES, INC. 2000
Astorga, Davao Del Sur, Philippines

The Project is to conduct Third Party Inspection and Non destructive testing on Re-qualification of LPG hauling lorry tank and pipe lines. Calculate Maximum Allowable Working Pressure for hydro test pressure as per ASME VIII and V. secure working permit in every used of Radioactive materials (RAM)

Client : MULTI GAS CORPORATION 2000
Isabella, Philippines

The Project is to conduct Third Party Inspection and Non destructive testing on Requalification of LPG hauling lorry tank and pipe lines. Calculate Maximum Allowable Working Pressure for hydro test pressure as per ASME VIII and V. secure working permit in every used of Radioactive materials (RAM)

ACCOMPLISHMENT:

„« Completed project as mention above as third party inspector for LPG requalification of trailer/ lorry tank
„« Attended Seminar on Cylinder Inspection on Shell house Makati Philippines.
Page 6 of 8


EMPLOYER : NDT-Phils., INSPECTION SERVICES CORP. July ¡V December 1999
414 DFS Building Corner Remedios & Taft Avenue, Philippines
Tel. No. 524-1261 to 69 Tele Fax 523-0691

POSITION : NDT LEVEL ¡V 2

JOB DESCRIPTION:

„« Conduct Radiographic Test, Ultrasonic Test, Dye Penetrant Test and Magnetic Particles Test
„« Evaluate/Prepare Test Results for Client¡¦s Representative review and approval

Client : BAUANG POWER PLANT 1999
Bauang, La Union, Philippines

The Project is to conduct radiographic testing in submarine pipeline and film interpretation. Secure working permit in every used of Radioactive materials (RAM)

ACCOMPLISHMENT:

„« Completed project in Bauang power plant
„« Attend training for National Training Course on Non-Destructive Testing Radiographic testing level 2 in Philippines Nuclear Research Institute
„« Attend training for National Training Course on Non-Destructive Testing Ultrasonic Testing level 2 in Philippines Nuclear Research Institute


EMPLOYER : GLOBE TELECOM GMCR, INC. May ¡V July 1999
Dulong Bayan, Bacoor, Cavite, Philippines

POSITION : Sales Representative

JOB DESCRIPTION:

„« Conduct Inventory in different places in Cavite, Philippines
„« Prepare Working Instruction (WI)
„« Prepare report based in fieldwork
„« Maintain Up-to-date development to client


EMPLOYER : CAMBRIDGE ELECTRONICS CORP. May ¡V July 1999
Brgy. Langkaan, Dasmarinas, Cavite, Philippines

POSITION : ON THE JOB TRAINING

JOB DESCRIPTION:

„« Operate CNC machine for drilling of printed circuit board
„« Checking 1st run of program if correct
„« Operate shearing machine for cutting
„« Checking layout of printed circuit board


All Contents Copyright (c) 2014 NDT.org
Use Subject to Terms and Conditions
Phone: 888.278.8804 | webmaster@ndt.org